Related to the characteristics of the Çetin Hydro Power Plant Project given below; -All application projects of the concrete face slab dam, -Application projects of the Diversion Tunnel and Gate Shaft Structure, -Application projects of the Water Intake System Structure and -Application projects of the Spillway have been prepared by our team. Kavşakbendi Dam Project is being consturcted in the city of Adana and on the two extension named as Zamantı and Göksu of the Seyhan River. Its reservoir lenght is 11km along Göksu river and 10 km along Zamantı River. Concrete faced rockfill dam has 88 meter height from ground, 186 meter lenght along crest and 357.600m3 of dam volume. One of the two modified horse shoe type diversion tunnels has 8,5 meter of internal diameter lenght and the other one has 7,90 meter of internal diameter lenght. There is a spillway which has 3 radial cover and is able to dump 5000m3 of water on the main dam. One of the three admission valve which is typed as butterfly and located in the station building which has 139.680m3 of volume has a 3,60 meter of diameter lenght. The three vertical axial Francis turbines has 214,29 rpm speed. The Kavşakbendi Dam Project which has been mainly covered above will able to produce 715,43 GW hour per year and will be constructed so as to maintain 181 MW ( with the etek santrali(2.92 MW) ) energy of electricity.
Designed for Dolsar Engineering Inc.
The Powerhouse Front View;
The Downstream Spillway View;
The Upstream Spillway View;
The Dam Body Plinth View;
Plinth and Water Intake System View;
Tunnel Plinths View;
|